Phase Conversion of Service

If an existing MVEA service needs to change for any of the following reasons, a Phase Conversion of Service Request is needed:

  • Three phase service to single phase service
  • Single phase service to three phase service
  • Changing a three phase 120/208 voltage service to 277/480 voltage service or vice versa

Getting Started

  1. Download and complete a Load Data Sheet (PDF) which can be found below for your new load.
  2. Complete and submit a “Phase Conversion Application Request” form found below and attach the completed Load Data Sheet to this form.
  3. After the Engineering Department receives your request, our team will review and finalize your application.
  4. Our team will send you an application document, which requires your signature, along with an engineering fee payment of $500.
  5. Once our team has received your signed application and the $500 engineering fee payment, we will schedule an onsite meeting with you and one of our Line Designers to discuss your projects’ needs.

Load Data Sheet

A Load Data Sheet is required for all MVEA electric projects. Completely fill out and sign the Load Data Sheet which can be found below before submitting it to MVEA. Please remember to sign the load sheet before submitting it to MVEA.

We have three convenient ways to submit Load Data Sheets:

  • Email them to MVEA’s Engineering Department
  • Fax: (719) 775-9513
  • Mail or deliver them to:
    • Falcon Office:Mountain View Electric Association, Inc. 11140 E. Woodmen Rd. Falcon, CO 80831
    • Limon Office:Mountain View Electric Association, Inc. 1655 5th St., P.O. Box 1600 Limon, CO 80828

We’re here to help, if you have any questions email MVEA’s Engineering Department or call us at (719) 495-2283 and ask to speak with an Engineering Services Representative.

Load Data Sheet (PDF)
  • The engineering fee will be applied to the overall cost of the project.
  • If the project is canceled, the engineering fee will be forfeited.

Phase Conversion Application Request

What type of service is this for?(Required)
Applicant's Name(Required)
Email(Required)
Please share the first and last name, email address, and phone number here if the point of contact is different than the applicant information above.
Current Mailing Address(Required)
New Construction Service Address(Required)
If you have not already emailed this to MVEA's engineering department, please upload the completed Commercial Load Data Sheet PDF (see step 1 under Phase Conversion Application Process & Requirements to download and complete). This document is required to review your application.
Drop files here or
Max. file size: 256 MB.
    Please upload a site plan sketch file that shows the following information: - Building location - Location of driveway - Electric meter location - Distance of meter location to the street - Surrounding streets - Water lines, well, septic, and leach field - Location of other utilities
    Drop files here or
    Max. file size: 256 MB.
      Please let us know what's on your mind. Have a question for us? Ask away.

      We’re here to help, if you have any questions email MVEA’s Engineering Department, or call us at (719) 495-2283 and ask to speak with an Engineering Services Representative.

      Phase Conversion of Service will be provided in accordance with the terms of the current MVEA Line Extension Policy.